Server Consolidation, Server Virtualisation, Storage Virtualization, Software Virtualization, ROI, TCO, Melbourne, Sydney

Technical Architecture Solutions
newsletter subscription Customer login
home
TAS VMware Consulting
services resources customers education news aboutus contactus
shopping cart order
TAS Services - Server review and TCO Analysis

 

TAS is experienced in performing virtualisation TCO and virtualisation scope reviews for companies of all sizes. Let us work with you in determining the scope and return from virtualisation. In addition, our analytical review provides high-level target virtual infrastructure design that can be used to jumpstart your project design phase.

The paper will include:

  • Assessment of the current Wintel and Linux estate for virtualisation applicability.
  • Assessment and documentation of the financial and business returns from virtualization.
  • Assessment of the use of the SAN with respect to virtualization and recommendations on its use.
  • Proposal of a high level target environment.

TAS has a breadth of virtualisation TCO documentation for you to base your business case. sample table of contents of a reportClick here for a sample table of contents of a report OR try out our TCO calculator !

What options are available?

Performance snapshot

Virtualisation review and TCO analysis based on performance snapshot (1-2 days performance data per machine)

Performance Analysis

Virtualisation review and TCO analysis based on performance analysis (14 - 30 days performance data per machine)

For each of the above options you can:

  1. Pick a representative subset and analyse that subset for suitability and utilisation.
  2. Analyse the entire server estate for suitability and utilisation.

How is the performance data collected?

There are several options available to collect performance data and TAS is on hand to assist you in determining the best method for your organisation. In general the options are:

  1. Use existing performance monitoring data (if you have the tools in place).
  2. PlateSpin PowerRecon.
  3. VMware Capacity Planner service.
  4. Native OS tools - Perfmon for windows and sar for Linux.

back to topWhat is needed for the TCO document?

Resources Required

  1. Server utilisation information.
  2. Future server and capacity growth.
  3. Indicative costings of data centre space.
  4. Indicative server costs and maintenance costs.
  5. Architecture map of existing systems.
  6. Current storage utilisation.
  7. Future storage growth.
  8. Accurate asset data.

Get the Experts to turn your business case into reality..

Once you know your expected returns and get budget approval for a project why not engage TAS to:

  1. Complete the virtual infrastructure design.
  2. Build and deploy your virtual infrastructure environment.
  3. Assist with operational and support procedures and methodology for the virtual infrastructure.
  4. P2V (Physical to Virtual) your existing servers into the new virtual infrastructure.
  5. Provide theTAS VMware mentoring and third level VMware admin support hours.
  6. Review your disaster recovery process to leverage your new virtual infrastructure.
Operations doc TOCOperations doc TOC, Design TOCDesign TOC, BusinessBusiness

What if I'm an outsourcing or hosting company? How can TAS help me?

TAS can help you to

  • Understand the potential service offerings under a virtual infrastructure.
  • Build a service cost model.
  • Build a service business model.
  • Design and deploy your virtual infrastructure
  • Review your virtual infrastructure to ensure that you're running at the optimal level.
  • Provide on-call SLA based third level virtual infrastructure support.

Please download our pdf brochure PDF brochure for more info and fill out our
information request form or contact us to help with your current and or future needs.

TAS Services 
SOLUTIONS DESIGN
    Creation and Maintenance
    Due Diligence
    Cost Compilation
    Technical Risk Analysis
DEPLOYMENT MANAGEMENT
    Cost & Duration Analysis
    Project Plan Creation
    Project Plan Due Diligence
    Project Management
SPECIALIST CONSULTING
    Turn key Disaster Recovery
    Infrastructure
    Database
    Data Centre
    Best Practices
MANAGED SERVICES
    Systems Administration
    Database Administration
    Capacity Planning
    On Demand Resources
    Operational Best Practices
    VMware Mentoring
VIRTUALISATION CONSULTING
    TAS consolidation TCO / VI     scope analysis
    PlateSpin
    VMware Kick Start
    VMware Virtualisation
    VMware Health Check
    VMware Mentoring
    VMware FAQ
FINANCIAL SERVICES
VMware Authorized Consultant
Platespin Products
 
   
exa